CNC Tube Bender
In stock3.0 in x 20 ft 3D CNC Mandrel Tube Bender USA
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- UTB-30-20FT-30D-A3
- Machine family
- CNC Tube Bender
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
UmproTech 3.0 in x 20 ft 3D CNC Mandrel Tube Bender USA
CNC mandrel tube bender package for U.S. fabrication shops reviewing 3.0 in tube capacity, 20 ft tube length, 3D bend capability, axis configuration, tooling, delivery, startup support, operator training and financing.
Available RFQ paths include 3-Axis, 5-Axis and 8-Axis configurations. Request a quote from UmproTech to confirm the right package for your tube size, material, bend radius, production volume and tooling needs.
Budgetary Equipment Prices — UmproTech 3.0 in × 20 ft 3D CNC Mandrel Tube Bender
Estimated equipment prices are Budgetary only and valid through November 13, 2026.
- 3-Axis: $169,900 USD equipment estimate; startup/operator support $17,200 and application-specific tooling/workholding allowance $31,300 are separate.
- 5-Axis: $269,900 USD equipment estimate; startup/operator support $23,500 and application-specific tooling/workholding allowance $43,800 are separate.
- 8-Axis: $469,900 USD equipment estimate; startup/operator support $34,400 and application-specific tooling/workholding allowance $65,700 are separate.
Each selected amount covers one estimated China-origin tube-bender platform for the named axis class, normalized inbound freight to UmproTech's U.S. warehouse, warehouse preparation, technical handling, one landed-cost planning reserve and one uncertainty reserve. It is not a turnkey installed price.
Market control: current price-bearing China offers for nominal 75–76 mm / 3 in CNC mandrel benders include about $8,000–$25,800 for a broad 76CNC class, $22,800–$42,800 for a two-stack class, about $42,500–$43,000 for a public four-axis class, and $19,999–$99,999 for a broad full-electric multi-stack class. The lowest listings are weak comparables because exact axis maps, 20 ft usable feed, long-bed support, tooling, controls and U.S. compliance are not established. Current U.S. manufacturer documentation confirms 3 in all-electric single- and dual-stack equipment with extended-bed options and a 3 in ten-axis technical class, but public price-bearing exact 3/5/8-axis 20 ft equivalents were not found. These are commercial and technical boundaries, not proof that any listed machine is the exact UmproTech build.
Inclusion control: the axis names are catalog selections only. The written quote must list each controlled axis, hydraulic versus servo functions, tool-stack count and automation. One application-specific tooling allowance is shown separately; the selected equipment prices do not include a bend die, clamp die, pressure die, mandrel, wiper die or collet unless the quote lists it. No tooling or mandatory system is charged twice.
The 3.0 in capacity depends on material, wall thickness, centerline radius and tooling. The 20 ft label is treated as a stock/feed-length class pending exact release; it is not a guaranteed finished-part envelope or proof of a 20 ft one-stroke feed. Long-bed supports, follower/sag control, hitch-feed limits, loading/unloading and maximum usable feed must be stated in the build sheet. The catalog 3.0D label is not presented as a universal 3×OD minimum centerline radius; final capability must be confirmed from the exact material, wall, radius and tooling package.
Quoted separately unless the written quote says otherwise: outbound customer freight, unloading, rigging, foundations, facility electrical work, transformer or phase conversion, hydraulic oil, tooling, guarding integration, installation, application prove-out and operator training. No process chiller is assumed or charged; any hydraulic oil cooler, water/fan cooling or auxiliary package must be confirmed in the build sheet.
Configuration hold: final written scope must confirm material and wall at rated OD, minimum and maximum CLR, usable feed length and feed method, long-stock supports, exact axes and servo/hydraulic architecture, stack count, mandrel and wiper controls, booster, cut-off or unload automation, controller, accuracy/repeatability method, voltage/phase/air, guarding and safety validation, certification, warranty, lead time and every included accessory.
Send tube OD, wall, alloy, bend radii, bend sequence/drawing, straight lengths, annual volume, tooling requirement, site utilities and delivery ZIP for an exact-build quote.