UmproTech HBM 2-Axis CNC Press Brakes — HBM 100/10 TP10S • 100 Ton × 10 ft
01Machine 02Facility 03Delivery

2-Axis CNC Press Brake

In stock

HBM 160 Ton x 10 ft TP10S CNC Press Brake USA

Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.

Equipment price $91,200.00 USD

Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.

Application review Installation and startup Operator training Available project services
01Application

Material, geometry, capacity, production volume, quality, and workflow.

02Configuration

Model, controller, source or drive, tooling, included equipment, and options.

03Facility

Power, air, gas, extraction, cooling, access, unloading, and placement.

04Project scope

Delivery, startup, training, warranty, service, parts, and acceptance.

Buyer fit

Match the machine to the real work

The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.

Prepare these application details

  • Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
  • Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
  • Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
  • Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.

Machine specifications

Technical and facility planning

Review the selected machine build, utilities, included equipment, and site requirements together before ordering.

Model
HBM-160-3200C
Machine family
2-Axis CNC Press Brake
Working area / capacity
Defined in the written build sheet
Power / tonnage
Matched after application review
Controller and axes
Confirmed for the selected build
Electrical requirements
Confirmed after site and build review
Machine dimensions
Defined in the written build sheet
Machine weight
Defined in the written build sheet
Lead time
Confirm with sales

Included equipment

The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.

Available options

Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.

Site readiness

Plan the facility before delivery

Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.

  • Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
  • Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
  • Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
  • Complete the site-readiness checklist before installation and training are scheduled.

Delivered project and ownership

Installation, training, warranty, service, and parts

The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.

Installation and startup

Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.

Operator training

Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.

Warranty

Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.

Service and parts

Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.

Frequently asked questions

Questions to resolve before ordering

How do I confirm this machine is suitable for my parts?

Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.

What electrical and utility information is required?

Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.

What is included with the machine?

The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.

How are delivery, installation, and training handled?

The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.

What warranty and service support applies?

The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.

Complete machine information Description

UmproTech HBM 160/10 TP10S — 160 ton × 10 ft CNC press brake

Budgetary / Estimated configuration. This listing covers the catalog-identified 160 ton × 3200 mm (10 ft) HBM platform with TP10S control. Final technical scope and commercial terms are confirmed in a written quotation.

Published pricing

  • Estimated equipment subtotal: $91,200
  • Startup, integration and operator-training allowance: $15,800
  • Tooling and accessory allowance: $6,400
  • Estimated full configured package: $113,400

No chiller or mandatory cooling-system charge is included for this press-brake configuration. Prices are budgetary estimates in USD. The equipment subtotal is not a delivered turnkey commitment.

Scope confirmation required

Before order acceptance, UmproTech will confirm the released machine BOM, exact TP10S execution and axes, backgauge, standard or optional tooling, clamping, crowning, guarding and safety system, stroke, daylight, throat, accuracy, hydraulic components, voltage, phase, full-load current, transformer requirement, certifications, warranty, lead time and applicable HTS/import treatment.

Unless a signed quotation states otherwise, outbound freight, unloading, rigging, foundations, electrical work, transformer, permits, taxes, special tooling, commissioning travel and production materials are excluded. No inventory quantity, serial number, warehouse location or guaranteed ship date is represented here.

Quotation validity: 14 days unless a written quotation states otherwise.

Smart project bundle

Build the complete machine project.

Automatically review compatible cooling, compressed air, power conversion, starter consumables and process tooling before requesting the written quote.

Bundle built for UmproTech HBM 160 Ton x 10 ft TP10S CNC Press Brake USA Facility voltage, phase and available service are confirmed before quotation.
One-click package modes

Choose the project depth

Start with a proven scope, then fine-tune individual items.

Loading compatible products…

Compatibility engine

Complete project essentials

Select the scope to include. Final model, capacity and electrical compatibility are confirmed by UmproTech engineering.

Turnkey services

Delivery, startup and operator handoff

Carry the machine from warehouse release through safe startup and productive operator use.

Project-scope coverage 0/8
Coverage shows selected requirement groups, not final site approval.

Recommendations are planning guidance. Exact accessory models, utilities, availability, freight and field-service scope are confirmed in the written quotation.

Search

Search machines, services and resources

Search by process, machine family, model, service need or planning topic.

Popular starting points

Enter at least two characters to see matching published resources.

Save this machine and compare the complete setup.
Smart machine shortlist

Compare your shortlist

Compare the machine and the site requirements side by side before requesting a quote.

Specifications follow the governed product data and are confirmed on the written quote.
Decision intelligence

Choose what matters most

The signal uses only governed specifications in this comparison. It is not a substitute for application review.

Comparison priority