Tube Laser Cutter
In stock6kW Ø4 in x 20 ft Enclosed Tube Laser USA
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- UTL-4IN-20FT-6KW-ENC-B
- Machine family
- Tube Laser Cutter
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Budgetary / Estimated equipment pricing — USD
Valid through November 5, 2026. Prices below apply only to the exact configuration and SKU selected.
| Configuration | Machine | Required water cooling | Equipment subtotal |
|---|---|---|---|
| Base UTL-4IN-20FT-6KW-ENC-B |
$98,700 | $5,000 | $103,700 |
| 3-Chuck UTL-4IN-20FT-6KW-ENC-3C |
$116,200 | $4,900 | $121,100 |
| 3-Chuck + Auto Loader UTL-4IN-20FT-6KW-ENC-3C-AL |
$141,800 | $4,800 | $146,600 |
Cooling is required and charged once. Each equipment subtotal includes the machine and one matched water-cooling allowance. The exact cooler model, integration and build are confirmed in the final BOM.
These are commercial estimates based on current Chinese comparables and a landed-cost model. The exact laser source, cutting head, controller, chuck geometry, electrical build and certifications are not represented as confirmed until the factory build sheet is accepted.
Base excludes automatic loading. The 3-Chuck and 3-Chuck + Auto Loader rows are separate proposed builds; loader range, supported profiles, tube capacity and unloading scope are confirmed in the quotation.
Additional scope: Customer-site freight from warehouse, unloading and rigging, facility electrical work, transformers or phase conversion, assist-gas or compressed-air infrastructure, extraction, site safety/compliance work, field-service travel and applicable sales tax are additional unless expressly included in writing. The equipment subtotal is not a delivered or turnkey total.
Availability: In stock. Exact build, machine location and dispatch timing are confirmed before order acceptance; this status does not state a guaranteed quantity or ship date.