Power Equipment
In stockSingle-Phase-to-Three-Phase Converter Package
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- SKU-UMP-PWR-007
- Machine family
- Power Equipment
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
The Single-Phase-to-Three-Phase Converter Package is a component package supplied to U.S. buyers by UmproTech. Scope is written against your equipment and your site, not against a category. Final configuration, compatibility, and availability are confirmed in the written quotation.
Where this package is used
- Converting single-phase service to three-phase for shop equipment
- Machine disconnects, breakers and distribution for new installations
- Power factor correction where utility penalties apply
- Avoiding or deferring a utility service upgrade
- Backup power for critical machines
- Stepping your existing service voltage to what an imported machine requires
Who this fits
- Shops adding machines beyond current panel capacity
- Rural and light-industrial sites with limited service
- Operations avoiding a costly utility service upgrade
- Shops with single-phase service buying three-phase machines
- Buyers of imported equipment built for a different service voltage
Configuration and component options
A component package is specified per assembly rather than from one fixed part number. The options below are the shortlist this configuration is drawn from.
| Assembly | Options | How it is selected |
|---|---|---|
| Main motor options | WEG / Siemens / TECO / ABB | Confirmed by build |
| VFD and inverter options | Delta / Yaskawa / ABB / Schneider Electric | Confirmed by build |
| PLC and HMI options | Siemens / Schneider Electric / Delta / Omron | Configured at build |
| Electrical and panel component options | Schneider Electric / Siemens / Omron / Delta | Panel standard by build |
| Pneumatic component options | SMC / AirTAC / Festo | Confirmed by build |
Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.
What to confirm for compatibility
- Machine make, model, year and serial number
- Photographs of the mounting point or the component being replaced
- Existing component brand and model where one is fitted
- Material, thickness and part sizes the package must handle
- Incoming service voltage, phase and available amperage where the package is powered
- Installation location and delivery ZIP code
Fit and supply
Compatibility of the component package is confirmed against your machine before anything ships. Final configuration, compatibility, and availability are confirmed in the written quotation.
Supplied and quoted separately
What ships with the component package is itemized on the quotation. Installation, commissioning, consumables and any electrical or mechanical work on your machine are quoted as separate lines where they apply. Tell us what you already hold in stock so the same item is not quoted twice.
Wear, replacement and shelf stock
Replacement intervals for a component package follow your duty cycle and the material you run, not a calendar. Tell us hours per shift and what you process, and a recommended shelf-stock list can be quoted alongside the supply. Final configuration, compatibility, and availability are confirmed in the written quotation.
Confirmed at quotation
- Exact contents and quantities of the package
- Compatibility with the machine make, model and year you have stated
- Any adaptation, bracketry or machine-side work required
- Freight class, crated weight and dimensions
- Lead time and, where applicable, warranty terms
Freight and delivery
Freight on a component package is quoted to your ZIP code. Send it with the request, and say whether the site is a business with a dock, a business without a dock, or a residential or limited-access location. Final configuration, compatibility, and availability are confirmed in the written quotation.
Request a parts quotation
Send the details above and the response is a written quotation covering the equipment, freight, unloading and startup scope. Request a parts quotation.