CNC Lathe
In stockCNC Pipe Threading Lathe
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- SKU-UMP-TPF-001
- Machine family
- CNC Lathe
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Direct answer: The UmproTech CNC Pipe Threading Lathe is a CNC lathe or turning center for precision turned parts, shafts, bushings and threaded components, supplied to U.S. buyers by UmproTech. This listing is the CNC control configuration. It is quoted per project — send your material, thickness in inches, part sizes, production volume and delivery ZIP code and you get a written quote covering the machine, freight, unloading, startup and training.
Who this CNC lathe is for
- Shaft and bushing producers
- Oilfield and pipe threading shops
- Original-equipment turned-part suppliers
- Maintenance shops making replacement parts
- Schools and training programs
Common applications
- Facing, boring and threading operations
- Live tooling for milled features in one setup
- Bar feeding for volume turned parts on the right machine
- Pipe and coupling threading on the right configuration
- Bringing outsourced turning in-house
- Turning shafts, pins and bushings
Specifications and what is confirmed at quote
U.S. units throughout. Where a cnc lathe row reads Quote review, the value follows your material, your building and your freight and is stated on the written quotation.
| Item | Value | Source |
|---|---|---|
| Control | CNC | Model configuration |
| Cutting / forming capacity | Confirmed by application review — send material and thickness in inches | Quote review |
| Machine dimensions | To be confirmed in inches and feet before order | Quote review |
| Machine weight | To be confirmed in lb — needed for freight class and rigging | Quote review |
| Electrical requirement | To be confirmed: voltage, phase and available amperage. U.S. service is 60 Hz | Quote review |
| Required air pressure | To be confirmed in PSI | Quote review |
| Airflow requirement | To be confirmed in CFM | Quote review |
| Lead time | To be confirmed at quote | Quote review |
| Warranty term | Confirmed in writing on the quote | Quote review |
| Price | Request for quote — configured per project | Quote review |
Compare with the other models in this range
Comparable cnc lathe models are below. If your work sits at the boundary between two, the application review settles it before the quotation is issued. See the full cnc lathe range.
| Model | Control |
|---|---|
| CNC Lathe Parts Catcher System | Control: CNC |
| CNC Lathe with Live Tooling | Control: CNC |
| CNC Pipe Threading Lathe (this page) | Control: CNC |
| CNC Turning Center with Sub-Spindle | Control: CNC |
| Compact CNC Lathe | Control: CNC |
What to confirm before we quote
- Maximum part diameter and length
- Chuck size and through-spindle bore requirement
- Materials and typical depth of cut
- Tolerance and finish requirement
- Live tooling or Y-axis need
- Bar feeder or manual loading
- Tool turret capacity and tooling standard
- Coolant and chip handling plan
- Shop power and delivery ZIP code with rigging method
Send these numbers in U.S. units
- Heaviest workpiece weight in lb
- Incoming service voltage, phase, 60 Hz confirmation and available amperage
- Available compressed air in CFM at the required PSI
Summary
UmproTech supplies the CNC Pipe Threading Lathe to U.S. fabrication buyers including shaft and bushing producers, oilfield and pipe threading shops and original-equipment turned-part suppliers. Model-confirmed configuration — Control: CNC. Cutting, forming and production capacity is confirmed by application review, not published as a claim. All figures on this page are stated in U.S. units. Buyers should confirm material and thickness in inches, part size, production volume, shop power at 60 Hz, delivery ZIP code and unloading method. The next step is to request a quote covering the machine, freight, unloading, installation, training and financing review.
Configuration and component options
The assemblies below are specified while the cnc lathe is configured; the shortlist shows the options available for each.
| Assembly | Options | How it is selected |
|---|---|---|
| Machine CNC control options | FANUC / Siemens / Mitsubishi Electric / Syntec | Quote-selected |
| Ballscrew and linear guide options | HIWIN / PMI / THK / TBI | Confirmed by build |
| Spindle bearing options | NSK / NTN / FAG / Barden-class precision | Confirmed by build |
| Turret and tailstock options | Duplomatic / Baruffaldi / Sauter-class turret | Configured at build |
| Central lubrication options | Matched automatic lubrication unit | Confirmed by build |
| Electrical and panel component options | Schneider Electric / Siemens / Omron / Delta | Panel standard by build |
Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.
Facility and utility review
Utility review for a cnc lathe is completed before the order rather than on delivery day — voltage, phase and amperage at 60 Hz, floor loading and access, and the process utilities the application needs. Final configuration, compatibility, and availability are confirmed in the written quotation.
What to send for an accurate quotation
Include these details and the cnc lathe quotation is written against your job rather than a price range:
- Material and maximum thickness in inches
- Part or sheet sizes in inches or feet
- Production target — parts per shift or per week
- Incoming service voltage, phase and available amperage at 60 Hz
- Assist gas or compressed air already available on site
- Automation, loading or unloading requirements
- Drawings, a sample part, or a nameplate photo of the machine being replaced
- Installation location and delivery ZIP code
Request an equipment quotation
Submit the intake form with those details and the quotation is prepared against your application rather than a generic specification. Request an equipment quotation.