PT LightCutter 2.0 replacement nozzle connector — front view
01Machine 02Facility 03Delivery

Laser Cutting Head Parts

Confirm with sales

Nozzle Connector for PT LightCutter 2.0

Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.

Equipment price $250.60 USD

Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.

Application review Installation and startup Operator training Available project services
01Application

Material, geometry, capacity, production volume, quality, and workflow.

02Configuration

Model, controller, source or drive, tooling, included equipment, and options.

03Facility

Power, air, gas, extraction, cooling, access, unloading, and placement.

04Project scope

Delivery, startup, training, warranty, service, parts, and acceptance.

Buyer fit

Match the machine to the real work

The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.

Prepare these application details

  • Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
  • Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
  • Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
  • Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.

Machine specifications

Technical and facility planning

Review the selected machine build, utilities, included equipment, and site requirements together before ordering.

Model
LH04PLCAECO
Machine family
Laser Cutting Head Parts
Working area / capacity
Defined in the written build sheet
Power / tonnage
Matched after application review
Controller and axes
Confirmed for the selected build
Electrical requirements
Confirmed after site and build review
Machine dimensions
Defined in the written build sheet
Machine weight
Defined in the written build sheet
Lead time
Confirm with sales

Included equipment

The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.

Available options

Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.

Site readiness

Plan the facility before delivery

Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.

  • Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
  • Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
  • Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
  • Complete the site-readiness checklist before installation and training are scheduled.

Delivered project and ownership

Installation, training, warranty, service, and parts

The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.

Installation and startup

Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.

Operator training

Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.

Warranty

Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.

Service and parts

Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.

Frequently asked questions

Questions to resolve before ordering

How do I confirm this machine is suitable for my parts?

Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.

What electrical and utility information is required?

Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.

What is included with the machine?

The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.

How are delivery, installation, and training handled?

The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.

What warranty and service support applies?

The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.

Complete machine information Description

Match this replacement nozzle connector to the supplier-listed PT LightCutter 2.0 cutting head. Compare the installed head generation, original part profile and mounting layout before selecting the replacement; other LightCutter connectors are separate configurations.

Configuration

  • Listed application: PT LightCutter 2.0.
  • Supplier SKU: LH04PLCAECO.
  • Supplied through Cloudray and offered by UmproTech. The source uses OEM wording; original Precitec manufacture is not verified.

Dimensions

Source drawing reference Approximate inches Original metric
Upper ring width shown 1.614 in 41 mm
Upper section height shown 0.748 in 19 mm
Base height shown 0.984 in 25 mm
Base dimension A 2.717 in 69 mm
Base dimension B 2.835 in 72 mm
Underside opening callout 0.669 in 17 mm

Inch values use 25.4 mm per inch and are rounded to three decimals. Retain the source metric references and drawing endpoints for fitment. The 17 mm underside opening callout is not a cutting-nozzle bore size. Thread size, thread pitch and mounting-hole spacing are not specified by the source.

Scope of supply

This listing covers the replacement connector, not a complete cutting head. Confirm the included ceramic, nozzle and other accessories before ordering. Photographed markings are retained for identification and do not establish original-manufacturer provenance or installation instructions.

UmproTech terms

UmproTech pricing, delivery arrangements and applicable warranty terms require confirmation before ordering.

Smart project bundle

Build the complete machine project.

Automatically review compatible cooling, compressed air, power conversion, starter consumables and process tooling before requesting the written quote.

Bundle built for UmproTech Nozzle Connector for PT LightCutter 2.0 Facility voltage, phase and available service are confirmed before quotation.
One-click package modes

Choose the project depth

Start with a proven scope, then fine-tune individual items.

Loading compatible products…

Compatibility engine

Complete project essentials

Select the scope to include. Final model, capacity and electrical compatibility are confirmed by UmproTech engineering.

Turnkey services

Delivery, startup and operator handoff

Carry the machine from warehouse release through safe startup and productive operator use.

Project-scope coverage 0/8
Coverage shows selected requirement groups, not final site approval.

Recommendations are planning guidance. Exact accessory models, utilities, availability, freight and field-service scope are confirmed in the written quotation.

Search

Search machines, services and resources

Search by process, machine family, model, service need or planning topic.

Popular starting points

Enter at least two characters to see matching published resources.

Save this machine and compare the complete setup.
Smart machine shortlist

Compare your shortlist

Compare the machine and the site requirements side by side before requesting a quote.

Specifications follow the governed product data and are confirmed on the written quote.
Decision intelligence

Choose what matters most

The signal uses only governed specifications in this comparison. It is not a substitute for application review.

Comparison priority