Power Equipment
Confirm with sales480V to 380V Step-Down Transformer
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- SKU-UMP-PWR-015
- Machine family
- Power Equipment
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Direct answer: The UmproTech 480V to 380V Step-Down Transformer is transformers, phase converters, disconnects and power distribution equipment that let imported or three-phase machines run on your existing shop service, supplied to U.S. buyers by UmproTech. This listing is the 480V to 380V voltage conversion configuration. It is quoted per project — send your material, thickness in inches, part sizes, production volume and delivery ZIP code and you get a written quote covering the machine, freight, unloading, startup and training.
Who this transformer and phase converter package is for
- Shops with single-phase service buying three-phase machines
- Buyers of imported equipment built for a different service voltage
- Shops adding machines beyond current panel capacity
- Rural and light-industrial sites with limited service
- Operations avoiding a costly utility service upgrade
Common applications
- Stepping your existing service voltage to what an imported machine requires
- Converting single-phase service to three-phase for shop equipment
- Machine disconnects, breakers and distribution for new installations
- Power factor correction where utility penalties apply
- Avoiding or deferring a utility service upgrade
- Backup power for critical machines
Specifications and what is confirmed at quote
What is fixed for this power unit is in the table below, in U.S. units. Rows marked Quote review are set by your application and confirmed in writing.
| Item | Value | Source |
|---|---|---|
| Voltage conversion | 480V to 380V | Model configuration |
| Cutting / forming capacity | Confirmed by application review — send material and thickness in inches | Quote review |
| Machine dimensions | To be confirmed in inches and feet before order | Quote review |
| Machine weight | To be confirmed in lb — needed for freight class and rigging | Quote review |
| Electrical requirement | To be confirmed: voltage, phase and available amperage. U.S. service is 60 Hz | Quote review |
| Required air pressure | To be confirmed in PSI | Quote review |
| Airflow requirement | To be confirmed in CFM | Quote review |
| Lead time | To be confirmed at quote | Quote review |
| Warranty term | Confirmed in writing on the quote | Quote review |
| Price | Request for quote — configured per project | Quote review |
Compare with the other models in this range
Other power unit models in the same range are listed below. Where a part sits between two sizes, the application review decides — not a default upsell. See the full power equipment range.
| Model | Voltage conversion |
|---|---|
| 240V Single-Phase to 380V Three-Phase Converter | Voltage: 240V; Shop power phase: single-phase, 60 Hz |
| 480V to 380V Step-Down Transformer (this page) | Voltage conversion: 480V to 380V |
| Automatic Voltage Regulator Package | Operation: Automatic |
| CNC Machine Backup Power System | Control: CNC |
| Electrical Distribution and Disconnect Package | Configuration confirmed at quote |
What to confirm before we quote
- Incoming service voltage, phase and available amperage
- The machine nameplate voltage, phase and full-load amps
- Machine list if you are feeding more than one
- Distance from panel to machine
- Panel capacity and available breaker space
- Local electrical code and inspection requirements
- Who performs the electrical install
- Delivery ZIP code and unloading method
Summary
UmproTech supplies the 480V to 380V Step-Down Transformer to U.S. fabrication buyers including shops with single-phase service buying three-phase machines, buyers of imported equipment built for a different service voltage and shops adding machines beyond current panel capacity. Model-confirmed configuration — Voltage conversion: 480V to 380V. Cutting, forming and production capacity is confirmed by application review, not published as a claim. All figures on this page are stated in U.S. units. Buyers should confirm material and thickness in inches, part size, production volume, shop power at 60 Hz, delivery ZIP code and unloading method. The next step is to request a quote covering the machine, freight, unloading, installation, training and financing review.
Configuration and component options
Each major assembly on a power unit is selected at configuration. The shortlist below is what the build is drawn from.
| Assembly | Options | How it is selected |
|---|---|---|
| Main motor options | WEG / Siemens / TECO / ABB | Confirmed by build |
| VFD and inverter options | Delta / Yaskawa / ABB / Schneider Electric | Confirmed by build |
| PLC and HMI options | Siemens / Schneider Electric / Delta / Omron | Configured at build |
| Electrical and panel component options | Schneider Electric / Siemens / Omron / Delta | Panel standard by build |
| Pneumatic component options | SMC / AirTAC / Festo | Confirmed by build |
Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.
Facility and utility review
Site review for a power unit covers incoming voltage, phase and available amperage at the installation point, floor loading, door width and the interior travel path, plus compressed air, gas and extraction where the process uses them. Final configuration, compatibility, and availability are confirmed in the written quotation.
What to send for an accurate quotation
The following turns an estimate into a firm quotation for a power unit:
- Material and maximum thickness in inches
- Part or sheet sizes in inches or feet
- Production target — parts per shift or per week
- Incoming service voltage, phase and available amperage at 60 Hz
- Assist gas or compressed air already available on site
- Automation, loading or unloading requirements
- Drawings, a sample part, or a nameplate photo of the machine being replaced
- Installation location and delivery ZIP code
Request an equipment quotation
With that information the quotation covers configuration, freight and installation scope in one written response. Request an equipment quotation.