UmproTech 1-Ton Welding Positioner on white background
01Machine 02Facility 03Delivery

Welding Equipment

In stock

1-Ton Welding Positioner

Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.

Equipment price $11,060.00 USD

Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.

Application review Installation and startup Operator training Available project services
01Application

Material, geometry, capacity, production volume, quality, and workflow.

02Configuration

Model, controller, source or drive, tooling, included equipment, and options.

03Facility

Power, air, gas, extraction, cooling, access, unloading, and placement.

04Project scope

Delivery, startup, training, warranty, service, parts, and acceptance.

Buyer fit

Match the machine to the real work

The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.

Prepare these application details

  • Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
  • Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
  • Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
  • Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.

Machine specifications

Technical and facility planning

Review the selected machine build, utilities, included equipment, and site requirements together before ordering.

Model
SKU-UMP-WLD-001
Machine family
Welding Equipment
Working area / capacity
Defined in the written build sheet
Power / tonnage
Matched after application review
Controller and axes
Confirmed for the selected build
Electrical requirements
Confirmed after site and build review
Machine dimensions
Defined in the written build sheet
Machine weight
Defined in the written build sheet
Lead time
Confirm with sales

Included equipment

The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.

Available options

Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.

Site readiness

Plan the facility before delivery

Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.

  • Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
  • Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
  • Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
  • Complete the site-readiness checklist before installation and training are scheduled.

Delivered project and ownership

Installation, training, warranty, service, and parts

The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.

Installation and startup

Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.

Operator training

Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.

Warranty

Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.

Service and parts

Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.

Frequently asked questions

Questions to resolve before ordering

How do I confirm this machine is suitable for my parts?

Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.

What electrical and utility information is required?

Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.

What is included with the machine?

The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.

How are delivery, installation, and training handled?

The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.

What warranty and service support applies?

The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.

Complete machine information Description

Direct answer: The UmproTech 1-Ton Welding Positioner is welding equipment including power sources, positioners, turning rolls and weld fixturing for production welding, supplied to U.S. buyers by UmproTech. This listing is the 1 US ton positioner load capacity configuration. It is quoted per project — send your material, thickness in inches, part sizes, production volume and delivery ZIP code and you get a written quote covering the machine, freight, unloading, startup and training.

Who this industrial welding equipment is for

  • Shops improving weld consistency and reducing operator fatigue
  • Weld shops and fabricators
  • Tank and vessel manufacturers
  • Structural and trailer builders
  • Maintenance and repair welding teams

Common applications

  • Positioning and rotating parts for better weld access
  • Circumferential welds on tanks and pipe with turning rolls
  • Fixturing and weld tables for repeatable assemblies
  • Reducing repositioning time and operator fatigue
  • Improving weld consistency on repeat assemblies
  • MIG, TIG and stick welding across shop work

Specifications and what is confirmed at quote

Figures for this welding system are stated in U.S. units. Anything marked Quote review is not published as a number because it depends on your parts, your building and your freight.

Item Value Source
Positioner load capacity 1 US ton Model configuration
Cutting / forming capacity Confirmed by application review — send material and thickness in inches Quote review
Machine dimensions To be confirmed in inches and feet before order Quote review
Machine weight To be confirmed in lb — needed for freight class and rigging Quote review
Electrical requirement To be confirmed: voltage, phase and available amperage. U.S. service is 60 Hz Quote review
Required air pressure To be confirmed in PSI Quote review
Airflow requirement To be confirmed in CFM Quote review
Lead time To be confirmed at quote Quote review
Warranty term Confirmed in writing on the quote Quote review
Price Request for quote — configured per project Quote review

Compare with the other models in this range

These are the other welding system models in the range. If your parts sit near the edge of one of them, send the parts and the review says which model fits rather than defaulting to the larger one. See the full welding equipment range.

Model Positioner load capacity
Welding Turning Rolls Configuration confirmed at quote
Welding Wire Feeder Package Configuration confirmed at quote
1-Ton Welding Positioner (this page) Positioner load capacity: 1 US ton
2-Ton Welding Positioner Positioner load capacity: 2 US tons
5-Ton Welding Positioner Positioner load capacity: 5 US tons

What to confirm before we quote

  • Materials and thickness range you weld
  • Welding processes you run
  • Part weight, size and center of gravity for positioners
  • Duty cycle and arc-on time per shift
  • Shielding gas supply and consumption
  • Operator skill level and training needs
  • Shop power at the weld station
  • Fume extraction plan
  • Delivery ZIP code and unloading method

Send these numbers in U.S. units

  • Heaviest workpiece weight in lb
  • Incoming service voltage, phase, 60 Hz confirmation and available amperage

Summary

UmproTech supplies the 1-Ton Welding Positioner to U.S. fabrication buyers including shops improving weld consistency and reducing operator fatigue, weld shops and fabricators and tank and vessel manufacturers. Model-confirmed configuration — Positioner load capacity: 1 US ton. Cutting, forming and production capacity is confirmed by application review, not published as a claim. All figures on this page are stated in U.S. units. Buyers should confirm material and thickness in inches, part size, production volume, shop power at 60 Hz, delivery ZIP code and unloading method. The next step is to request a quote covering the machine, freight, unloading, installation, training and financing review.

Configuration and component options

A welding system is specified per assembly rather than from one fixed part number. The options below are the shortlist this configuration is drawn from.

Assembly Options How it is selected
Welding power source options Lincoln Electric / Miller / Fronius / ESAB / Megmeet Process-matched
Torch and consumable options ABICOR Binzel / Tweco / matched Confirmed by build
Wire feeder options Matched single or dual-wire feeder package Confirmed by build
Fume and dust extraction options Donaldson / Nederman / matched unit Optional, scoped in the quote
Electrical and panel component options Schneider Electric / Siemens / Omron / Delta Panel standard by build

Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.

Facility and utility review

Before a welding system is scheduled for delivery, confirm the incoming service voltage, phase and available amperage at the machine location, plus any compressed air, gas or extraction the process needs. U.S. shop service runs at 60 Hz. Final configuration, compatibility, and availability are confirmed in the written quotation.

What to send for an accurate quotation

Send these with your welding system request and the quotation covers equipment, freight, unloading and startup instead of the equipment alone:

  • Material and maximum thickness in inches
  • Part or sheet sizes in inches or feet
  • Production target — parts per shift or per week
  • Incoming service voltage, phase and available amperage at 60 Hz
  • Assist gas or compressed air already available on site
  • Automation, loading or unloading requirements
  • Drawings, a sample part, or a nameplate photo of the machine being replaced
  • Installation location and delivery ZIP code

Request an equipment quotation

Send the details above and the response is a written quotation covering the equipment, freight, unloading and startup scope. Request an equipment quotation.

Smart project bundle

Build the complete machine project.

Automatically review compatible cooling, compressed air, power conversion, starter consumables and process tooling before requesting the written quote.

Bundle built for UmproTech 1-Ton Welding Positioner Facility voltage, phase and available service are confirmed before quotation.
One-click package modes

Choose the project depth

Start with a proven scope, then fine-tune individual items.

Loading compatible products…

Compatibility engine

Complete project essentials

Select the scope to include. Final model, capacity and electrical compatibility are confirmed by UmproTech engineering.

Turnkey services

Delivery, startup and operator handoff

Carry the machine from warehouse release through safe startup and productive operator use.

Project-scope coverage 0/8
Coverage shows selected requirement groups, not final site approval.

Recommendations are planning guidance. Exact accessory models, utilities, availability, freight and field-service scope are confirmed in the written quotation.

Search

Search machines, services and resources

Search by process, machine family, model, service need or planning topic.

Popular starting points

Enter at least two characters to see matching published resources.

Save this machine and compare the complete setup.
Smart machine shortlist

Compare your shortlist

Compare the machine and the site requirements side by side before requesting a quote.

Specifications follow the governed product data and are confirmed on the written quote.
Decision intelligence

Choose what matters most

The signal uses only governed specifications in this comparison. It is not a substitute for application review.

Comparison priority