Laser Cutting Head Parts
Confirm with salesNozzle Connector for WSX NC30 / NC30B
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- LH04WSX4
- Machine family
- Laser Cutting Head Parts
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Match a replacement nozzle connector to your WSX NC30 or NC30B cutting head using the mounting pattern, sealing face and connector details. This LH04WSX4 assembly is offered through UmproTech for the supplier-listed NC30 / NC30B application.
Fit and configuration
Supplier SKU: LH04WSX4. Confirm the exact installed head revision and original connector profile. The application photos show both NC30 and NC30B; they do not establish compatibility with other WSX head models.
Dimensions
| Feature | Approx. inches | Metric reference |
|---|---|---|
| Base length | 2.835 in | 72 mm |
| Base width | 2.717 in | 69 mm |
| Base thickness | 1.004 in | 25.5 mm |
| Upper ring outside diameter | 1.575 in | 40 mm |
| Vertical span marked above base in side-view image | 1.024 in | 26 mm |
| Mounting-hole spacing, first pair shown | 1.654 in | 42 mm |
| Mounting-hole spacing, second pair shown | 2.165 in | 55 mm |
| Rear opening dimension shown | 0.984 in | 25 mm |
Inch values are rounded conversions of the supplier's metric references. Follow the arrows in the dimension photos for the measurement locations. The 26 mm span is not specified as the overall assembly height. Dimensions alone do not establish thread sizes or connector standards; confirm the mating interfaces before fitting.
Included assembly
This listing covers the nozzle connector assembly shown in the product photos. Complete cutting heads and cutting nozzles shown in the application image are not included.
Selection and service
Compare the mounting holes, sealing face and side connections with the installed assembly. Use the applicable head manufacturer's service procedure for replacement. UmproTech pricing and applicable supply and warranty terms require confirmation.