2-Axis CNC Press Brake
In stockHBM 125/10 TP10S CNC Press Brake USA – 125 Ton x 10 ft
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- HBM-125-3200C
- Machine family
- 2-Axis CNC Press Brake
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
125 ton × 10 ft TP10S CNC press brake — Budgetary configuration
Estimated equipment subtotal: $85,900. This is a budgetary 125 ton × 10 ft / 3200 mm hydraulic CNC press brake configuration with TP10S control. The final machine build, controller, axes, backgauge, crowning, tooling interface, electrical requirements, dimensions, weight and lead time are confirmed in the written quotation.
Estimated project scope
- Machine equipment: $85,900
- Startup, integration and operator training allowance: $14,600
- Application tooling and accessories allowance: $6,400
- Estimated configured project total: $106,900
No chiller is required for this hydraulic press brake configuration. Freight beyond the stated equipment basis, unloading, rigging, site work, permits, taxes, utilities, transformer or power conversion, custom tooling, travel and other field-service costs are excluded unless expressly included in the written quotation.
Budgetary / Estimated. Pricing is based on current comparable Chinese 125 ton × 3200 mm TP10S equipment, current U.S. 125 ton × 10 ft market context and estimated U.S. landed-project economics because a supplier invoice and exact BOM were not available. The old retail price was retained only for audit and was not used as the calculation base.
No inventory quantity, serial number, warehouse location or guaranteed ship date is represented by this budgetary page.
Quote validity: 14 days. UmproTech confirms the exact build, capacity application, tooling, electrical requirements, delivery, startup, training, warranty and acceptance scope in writing before order.