Combined Plate & Tube Laser
In stock6x12 6kW Plate & Tube Fiber Laser USA
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- UCPT-6x12-6KW-T20FT-C8IN-BASE
- Machine family
- Combined Plate & Tube Laser
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
UmproTech 6×12 6kW Plate & Tube Fiber Laser — Budgetary Equipment Pricing
Budgetary / Estimated pricing. Offer validity: 14 days. The old retail list is not used as a pricing basis. Final configuration, exact laser source/head/controller, enclosure and interlocks, U.S. electrical build and total connected load, chuck/support geometry, usable tube envelope, matched cooling capacity/flow/head, automation capacities, delivery and commissioning require a released build sheet and written quotation.
| Configuration | Machine subtotal | Required matched 6kW cooling | Budgetary equipment subtotal | Estimated startup | Estimated initial spares | Estimated launch total |
|---|---|---|---|---|---|---|
| Base Line | $205,300 | $4,900 | $210,200 | $20,400 | $6,300 | $236,900 |
| Auto Sheet Load/Unload | $260,000 | $4,900 | $264,900 | $23,500 | $7,400 | $295,800 |
| Auto Sheet L/U + Tube Bundle Loader | $314,600 | $4,900 | $319,500 | $26,600 | $8,600 | $354,700 |
The required matched 6kW industrial water-cooling line is included exactly once in each equipment subtotal. The $4,900 cooling line, startup and initial-spares figures are budgetary estimates, not supplier invoices; exact compatibility and scope remain engineering holds.
Configuration boundaries
- Base Line: excludes automatic sheet load/unload and tube bundle loader.
- Auto Sheet Load/Unload: includes estimated automatic sheet handling; tube bundle loader excluded.
- Auto Sheet L/U + Tube Bundle Loader: includes estimated automatic sheet handling and estimated tube bundle loading.
Quoted separately unless expressly included
Customer-site freight, unloading and rigging, foundation or floor work, facility electrical or transformer work, assist-gas supply and compressor, extraction, guarding or code-driven site modifications, field-service travel beyond the stated startup allowance, permits, duties/taxes and sales or use tax. These are budgetary equipment and launch estimates, not turnkey prices.