Cutting Control Component
Confirm with salesWireless Handheld Control Box for Friendess Systems
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- LC04FSOEM
- Machine family
- Cutting Control Component
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Keep common machine commands close at hand with this wireless handheld control box for compatible Friendess laser-cutting systems. The photographed keypad brings start, pause, stop, jogging and setup commands onto a compact handheld unit.
Product and package reference
- Reference SKU: LC04FSOEM.
- The source photographs show the handheld unit and a separate USB receiver with cable.
- The source describes the product as OEM for Friendess systems. Confirm the actual unit revision, receiver and supplied accessories in the quotation.
- Machine controller boards shown in the application illustration are compatibility references and are not included.
Controls shown
The keypad includes Start, Pause, DryCut and Stop keys; directional and Z-axis commands; and labeled controls for laser, aiming, frame, point location and edge seek functions. A side ON/OFF switch is shown. Available actions depend on the connected controller, software and configuration. The presence of a Stop key is not evidence of a certified emergency-stop function.
Dimension references
| Source annotation | Approximate inches | Original metric reference |
|---|---|---|
| Marked body-length span | 5.512 in | 140 mm |
| Width | 3.228 in | 82 mm |
| Height as labeled | 1.024 in | 26 mm |
| Additional span marked near the handle end | 0.866 in | 22 mm |
Values follow the separate reference marks in the source photograph; the two length-related spans are not asserted to be an overall dimension. Inch values use 25.4 mm per inch and are rounded to three decimals. Verify the exact housing revision and clearance requirements before installation.
System compatibility
The supplier's application illustration lists FSCUT1000, FSCUT2000, FSCUT3000 and FSCUT4000. Confirm the precise controller board, software version, receiver pairing and supported command mapping for your machine. Wireless frequency, operating range and emergency-stop certification are not established by the available source information.
Ordering through UmproTech
Confirm the final UmproTech price, package contents, delivery terms and warranty in your quotation. Installation and retrofit services are included only when expressly listed.