Cutting Control Component
Confirm with salesFriendess BCL1501 Servo-Axis Expansion Boards
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- LC04FD1501A
- Machine family
- Cutting Control Component
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Choose the servo-axis expansion function your machine requires. The Friendess BCL1501 family shown in the source documentation offers an A board that switches between two outputs and a B board that duplicates a control signal to two synchronized outputs. These are individual expansion-board selections, not complete laser control systems or a two-board bundle.
Identify the correct board
Model-name discrepancy: the source options are named BCL1051A and BCL1051B, while the physical boards, title and technical illustrations read BCL1501A and BCL1501B. The original option names and SKUs remain unchanged for traceability. Confirm the actual board label, revision and machine documentation before ordering; the two model spellings are not treated as independently verified equivalents.
| Selection retained from source | Board shown in source | Documented function |
|---|---|---|
| BCL1051A / LC04FD1501A | BCL1501A | Routes one servo-axis control input between two outputs. The source states that the two outputs do not operate simultaneously. Includes origin/limit input connections; source power-supply entry: 24 V DC / 2 A. |
| BCL1051B / LC04FD1501B | BCL1501B | Duplicates one servo-axis control input into two synchronized output channels. The source lists no separate power supply for this board. |
Dimensions and environment
- Both boards: approximately 4.350 × 5.031 in (110.5 × 127.8 mm), as listed in the source specification. This is the two-dimensional size; confirm mounting clearance and connector projection for the actual revision.
- Source operating temperature: 32–131 °F (0–55 °C).
- Source humidity: 5–95%, non-condensing.
Integration and supplied items
The source names FSCUT1000, FSCUT2000 and FSCUT3000 control-system families and CypCut, CypTube and TubePro software. These references do not establish compatibility with every hardware or software revision. Its B-board note specifically names BMC1604 and BMC1605 and includes exclusions whose model identifiers require checking against the actual controller documentation. Verify the motion card, I/O board, servo drives, signal routing and software configuration before installation.
Servo cables are referenced as C15-0.6 / 1.5. Confirm the exact cable model, quantity and whether cables are supplied with the selected board. A software license, servo drive, power supply and complete control cabinet are not established as included by this listing.
UmproTech supply review
Confirm the final board identity and supplied items, UmproTech price, delivery, installation scope and warranty terms for the selected configuration. The packaging photograph shows the A board only and does not represent the B selection.