Cutting Control Component
Confirm with salesFriendess BCS100 Capacitive Height Controller
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- LC04BBCS100
- Machine family
- Cutting Control Component
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Manage cutting-head height with the Friendess BCS100 capacitive height controller for a compatible FSCUT laser-cutting installation. The photographed unit is marked BCS100 V3.0 and combines a display with function, numeric and height-control keys.
Product and package reference
- Model: BCS100; reference SKU: LC04BBCS100.
- Source photographs show the controller, a separate preamplifier and a short braided connection cable. Confirm the exact supplied components and hardware revision in your quotation.
- A full cutting control system, laser source, cutting head, servo motor and drive are not included unless expressly listed.
Panel dimensions
| Dimension | Approximate inches | Original metric reference |
|---|---|---|
| Overall panel width | 9.291 in | 236 mm |
| Overall panel height | 6.142 in | 156 mm |
| Horizontal mounting-hole center spacing | 8.858 in | 225 mm |
| Vertical mounting-hole center spacing | 5.709 in | 145 mm |
Inches are calculated at 25.4 mm per inch and rounded to three decimals. These dimensions describe the photographed front panel; they do not establish enclosure depth or the required cabinet cutout. Verify the exact revision and installation drawing before machining a panel.
Control and connection references
The supplier lists network communication, USB update support, calibration, edge detection, leapfrog and segmented-piercing functions. Availability depends on the installed controller, software and machine configuration. The rear reference photograph identifies Sensor, Input/Output, Servo Motor & Driver, USB and Ethernet connections, plus power terminals marked 24V, 0V and FG. Confirm pinout, supply requirements and integration against the correct manufacturer documentation before wiring.
The preamplifier mounting illustration has no explicit unit label; its dimensions are not presented here as confirmed inch or metric values. The preamplifier also has a separate product listing, so a replacement preamplifier and a complete BCS100 package must not be treated as the same item.
Ordering through UmproTech
Confirm hardware compatibility, included cables and sensing components, final UmproTech price, delivery terms and warranty in your quotation. Installation and retrofit services are included only when expressly listed.