Fiber Laser Accessory
In stockFiber Laser Rack and Pinion Replacement Kit
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- SKU-UMP-FLA-023
- Machine family
- Fiber Laser Accessory
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
The Fiber Laser Rack and Pinion Replacement Kit is a parts and consumables kit supplied to U.S. buyers by UmproTech. Scope is written against your equipment and your site, not against a category. Final configuration, compatibility, and availability are confirmed in the written quotation.
Where this package is used
- Restoring cut quality after nozzle or lens wear
- Planned preventive maintenance
- Second-shift and weekend coverage without waiting on freight
- Scheduled consumable replacement
- Keeping critical spares on the shelf to avoid downtime
Who this fits
- Shops standardizing spare-part stock
- Service technicians supporting multiple machines
- Buyers avoiding downtime from single-source consumables
- Shops running production fiber lasers
- Maintenance and tooling crews
Configuration and component options
Component selection on a parts kit is part of the configuration, not a fixed bill of materials. These are the assemblies and the options each is chosen from.
| Assembly | Options | How it is selected |
|---|---|---|
| Optics and consumable options | Precitec-compatible / Raytools-compatible / WSX-compatible / BOCI-compatible | Matched to your installed head |
| Nozzle and ceramic-ring options | Matched equipment-matched nozzle, ceramic ring and protective-window set | Head-matched |
| Assist-gas control options | SMC / AirTAC proportional control | Confirmed by build |
| Chiller options | S&A (Teyu) / Hanli / Tongfei | Source-matched |
Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.
What to confirm for compatibility
- Machine make, model, year and serial number
- Photographs of the mounting point or the component being replaced
- Existing component brand and model where one is fitted
- Material, thickness and part sizes the package must handle
- Incoming service voltage, phase and available amperage where the package is powered
- Installation location and delivery ZIP code
Fit and supply
Compatibility of the parts kit is confirmed against your machine before anything ships. Final configuration, compatibility, and availability are confirmed in the written quotation.
Supplied and quoted separately
The quotation itemizes what is included with the parts kit and lists installation, commissioning, consumables and any machine-side work separately. Tell us what you already hold in stock so the same item is not quoted twice.
Wear, replacement and shelf stock
Service life of a parts kit is set by duty and application. With your hours per shift and material we can quote a starter stock so the first failure is not also a wait. Final configuration, compatibility, and availability are confirmed in the written quotation.
Confirmed at quotation
- Exact contents and quantities of the package
- Compatibility with the machine make, model and year you have stated
- Any adaptation, bracketry or machine-side work required
- Freight class, crated weight and dimensions
- Lead time and, where applicable, warranty terms
Freight and delivery
Delivery of the parts kit is quoted against your ZIP code and site type; crated weight and dimensions are confirmed before the shipment is booked. Final configuration, compatibility, and availability are confirmed in the written quotation.
Request a parts quotation
Once those are confirmed, the quotation states the configuration, freight and installation scope in writing. Request a parts quotation.