Coil Processing Equipment
In stock5-Ton Hydraulic Coil Decoiler
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- SKU-UMP-COI-001
- Machine family
- Coil Processing Equipment
- Working area / capacity
- Defined in the written build sheet
- Power / tonnage
- Matched after application review
- Controller and axes
- Confirmed for the selected build
- Electrical requirements
- Confirmed after site and build review
- Machine dimensions
- Defined in the written build sheet
- Machine weight
- Defined in the written build sheet
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
Direct answer: The UmproTech 5-Ton Hydraulic Coil Decoiler is coil handling and processing equipment for decoiling, straightening, leveling, slitting and cut-to-length work, supplied to U.S. buyers by UmproTech. This listing is the 5 US tons coil weight capacity configuration. It is quoted per project — send your material, thickness in inches, part sizes, production volume and delivery ZIP code and you get a written quote covering the machine, freight, unloading, startup and training.
Who this coil processing equipment is for
- Shops cutting their own blanks to reduce material cost
- Shops buying material in coil instead of sheet
- Roll forming and tube mill operations
- Stamping operations feeding presses
- Service centers and processors
Common applications
- Reducing material cost by buying coil instead of cut sheet
- Feeding a roll forming or tube mill line
- Decoiling and feeding coil into a press or forming line
- Straightening and leveling before blanking
- Cut-to-length blank production
- Slitting coil to narrower widths
Specifications and what is confirmed at quote
U.S. units throughout. Where a coil processing line row reads Quote review, the value follows your material, your building and your freight and is stated on the written quotation.
| Item | Value | Source |
|---|---|---|
| Coil weight capacity | 5 US tons | Model configuration |
| Cutting / forming capacity | Confirmed by application review — send material and thickness in inches | Quote review |
| Machine dimensions | To be confirmed in inches and feet before order | Quote review |
| Machine weight | To be confirmed in lb — needed for freight class and rigging | Quote review |
| Electrical requirement | To be confirmed: voltage, phase and available amperage. U.S. service is 60 Hz | Quote review |
| Required air pressure | To be confirmed in PSI | Quote review |
| Airflow requirement | To be confirmed in CFM | Quote review |
| Lead time | To be confirmed at quote | Quote review |
| Warranty term | Confirmed in writing on the quote | Quote review |
| Price | Request for quote — configured per project | Quote review |
Compare with the other models in this range
Comparable coil processing line models are below. If your work sits at the boundary between two, the application review settles it before the quotation is issued. See the full coil processing equipment range.
| Model | Coil weight capacity |
|---|---|
| Press Feed and Straightener Package | Configuration confirmed at quote |
| Servo Coil Feeder | Configuration confirmed at quote |
| 5-Ton Hydraulic Coil Decoiler (this page) | Coil weight capacity: 5 US tons |
| 10-Ton Hydraulic Coil Decoiler | Coil weight capacity: 10 US tons |
| 20-Ton Hydraulic Coil Decoiler | Coil weight capacity: 20 US tons |
What to confirm before we quote
- Coil width, coil weight and inside/outside diameter
- Material, gauge range and coating
- Required output: blanks per hour or feet per minute
- Flatness or tolerance requirement
- Line integration: press, roll former, tube mill or standalone
- Shop power and floor length available
- Coil loading method: forklift, coil car or crane
- Delivery ZIP code and rigging method
Send these numbers in U.S. units
- Maximum thickness per material in fractional inches (1/16″, 1/8″, 3/16″, 1/4″, 3/8″, 1/2″, 1″)
- Heaviest workpiece weight in lb
- Incoming service voltage, phase, 60 Hz confirmation and available amperage
- Available floor area in square feet
Summary
UmproTech supplies the 5-Ton Hydraulic Coil Decoiler to U.S. fabrication buyers including shops cutting their own blanks to reduce material cost, shops buying material in coil instead of sheet and roll forming and tube mill operations. Model-confirmed configuration — Coil weight capacity: 5 US tons. Cutting, forming and production capacity is confirmed by application review, not published as a claim. All figures on this page are stated in U.S. units. Buyers should confirm material and thickness in inches, part size, production volume, shop power at 60 Hz, delivery ZIP code and unloading method. The next step is to request a quote covering the machine, freight, unloading, installation, training and financing review.
Configuration and component options
The assemblies below are specified while the coil processing line is configured; the shortlist shows the options available for each.
| Assembly | Options | How it is selected |
|---|---|---|
| Leveller and straightener roll options | Hardened, ground and matched roll set | Confirmed by build |
| PLC and HMI options | Siemens / Allen-Bradley / Schneider Electric / Mitsubishi Electric | Configured at build |
| Servo and drive options | Estun / Yaskawa / Delta / Siemens | Axis-matched |
| Hydraulic valve options | Bosch Rexroth / Parker / HOERBIGER / HAWE / Yuken | Circuit-matched |
| Gearmotor and reducer options | SEW-EURODRIVE / NORD / Bonfiglioli | Confirmed by build |
| Electrical and panel component options | Schneider Electric / Siemens / Omron / Delta | Panel standard by build |
Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.
Facility and utility review
Utility review for a coil processing line is completed before the order rather than on delivery day — voltage, phase and amperage at 60 Hz, floor loading and access, and the process utilities the application needs. Final configuration, compatibility, and availability are confirmed in the written quotation.
What to send for an accurate quotation
Include these details and the coil processing line quotation is written against your job rather than a price range:
- Material and maximum thickness in inches
- Part or sheet sizes in inches or feet
- Production target — parts per shift or per week
- Incoming service voltage, phase and available amperage at 60 Hz
- Assist gas or compressed air already available on site
- Automation, loading or unloading requirements
- Drawings, a sample part, or a nameplate photo of the machine being replaced
- Installation location and delivery ZIP code
Request an equipment quotation
Submit the intake form with those details and the quotation is prepared against your application rather than a generic specification. Request an equipment quotation.